| Register | Blogs | Arcade | Members List | B/S/T | Calendar | Search | Today's Posts | Mark Forums Read | Invite | Links | FAQ |
|
|||||||
| Cocker Autococker Discussion Area |
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
#1
|
||||
|
||||
|
planning on buying this 3 way as well as the shocktech actuator timing rod. installation and hose connection help required.
i do have a wgp hinge trigger, and what about the acutuator rod, does it just fit together with the 3 way? |
|
#2
|
||||
|
||||
|
Basically, just remove the hoses from your old 3-way, unscrew it and then install the new one. The instructions should come with the kit. The hoses will be in the following configuration:
Middle barb goes to the LPR If you have a slide trigger the front barb goes to the front of the Ram and the back goes to the back of the Ram. If you have a hinge trigger the front barb goes to the back of the Ram and the back barb goes to the front of the Ram. For timing basic instructions can be found here: http://www.endlesspb.com/tech/timing.html
__________________
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|