PBjunkie.com
Your Site Here - Your Site Here - Your Site Here - Your Site Here
Go Back   PBjunkie.com > Picnic Table > Misc

Misc Miscellaneous Paintball Gear Discussion Area

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 04-14-2008, 01:14 AM
blackrain's Avatar
Private Pump
 
Join Date: Mar 2008
Location: Wa.
Posts: 65
How To hydration pack

Last How To for a while. Mom is getting tired and I'm leaving out of State to work.
Started off as a $10.00 Hydration pack. Not much for the money. Trust me the Ebay picture looked better. I also needed a pattern for one. This was just thrown together very quickly. I'll probably just give this away. So here how it Started off. I'll post measurements later. I actually have a one piece design like the pods pouches, but I don't have any butcher paper to make a pattern. That will come at a later date and be much better then this one.
The Pack torn apart:
Not much to it and very cheaply made. Look at the tape that held the snaps in place.



Cutting the pattern:
Real simple just lay on fabric and pin. Then cut.


Both sides cut out:

Punch the snap holes:
Real simple this time. I just left the fabric pined together and punched thru the snap and fabric.


Laying and sewing the webbing:
I had to add better stuff. so this time we swed everything in real good, all the way across. I punched holes thru the webbing later to add the snaps.


MOLLE Straps:
Layed these down and pinned them. They are centered one inch apart from each other.

The MOLLE Weave Straps:
Takes four of them. They are an 1-1/4" from the side and sewn above the first straps.

Then put on the snaps:
At this time I put on all the snaps. Now was the right time.

Front MOLLE straps:
Nothing special about these, just a place to attach more gear if needed. If you don't want them, don't add them.


Add the VELCRO:

BIAS Tape:
This was around the whole inside, but I only put it on to clean up the edges of the outside flaps. It doesn't really matter if you BIAS tape all the edges. As long as you double or triple sew the sides,it will all hold together.


Sew the darts:
As in all the how to so far we have had darts. Just one of those things you need to give it that nice ROUND BOTTOM.


Ready to put together:
Just pin the bottom. This will hold everything even. Make sure the MOLLE straps are facing each other.

Sew down the sides:
Now line up the side edges and and sew all the way around the pack. Don't try to line up the front and back MOLLE straps, cause they won't. they will be off set from each other. We did a triple stich.

This is how it should look when finished:
This is an inside out picture. After it's all sewn up and ready to be turned rightside out.

Turn it right sideout:
Reach inside and pull outwards gently.

Here it is all finished:
Yes I know it looks low. That's due to lack of top MOLLE straps on the vest. That's soon to be fixed. It's attached. So here are a few pics with the hydration bladder. It's just pulled out slightly to show that it fits. It's actually inside the pack with the flap closed.


__________________
"When all else fails, pull the pin and find out what's next"

My feed back:
http://www.mcarterbrown.com/forums/f...-feedback.html

Like to make cool stuff:
http://www.freepaintballplans.com/forum/
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are On
Forum Jump


All times are GMT -4. The time now is 07:57 PM.

   

Powered by vBulletin
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0